Final | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PASS |
Jim Schmer
|
|
|
Final inspection for duplex units and detached garage; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|
Electrical Rough-In | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | PASS |
Joe Ray
|
|
|
rough in for garage; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|
Electrical Rough-In | 4/25/2003 | 4/28/2003 | 4/28/2003 | A | PART |
Pat Lass
|
|
|
rough-in inspection for garage and for underground uf wire for air conditioners; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
Garage not ready. U/G Ok 4/28/2003 8:50:21 AM
|
Rough-In Permanent Service | 4/23/2003 | 4/24/2003 | 4/24/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/23/2003 at 12:07:27 PM. Contact: ###-####. p/s ug n ok 4/24/2003 9:31:35 AM
|
Electrical Rough-In | 4/8/2003 | 4/8/2003 | 4/8/2003 | A | PASS |
Joe Ray
|
|
|
Inspection is for underground conduit from building to building. 25' of 2" pvc.; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|