Final | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 7:55:30 AM. Contact: ###-####.
|
Final | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | CANC |
Joe Ray
|
|
|
###-####
|
Final | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | FAIL |
Joe Ray
|
|
|
###-#### rod not complete and outlet spacing for third floor/cord for fixed wiring/no access for tub 8/7/2003 1:36:43 PM
|
Rough-In Permanent Service | 4/8/2003 | 4/8/2003 | 4/8/2003 | P | PASS |
Joe Ray
|
|
|
###-#### rod p/s ug n ok 4/8/2003 1:16:51 PM
|