Final | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/20/2003 at 3:24:31 PM. Contact: ###-####.
|
Conference | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 8:03:19 PM. Contact: ###-####.
|
Electrical Rough-In | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/22/2003 at 3:54:50 PM. Contact: ###-####. ceilings 7/23/2003 12:27:49 PM
|
Electrical Rough-In | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 7:23:17 PM. Contact: ###-####. hard ceiling ok for cover 6/10/2003 9:31:35 AM
|
Electrical Rough-In | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 5/9/2003 at 6:02:35 PM. Contact: ###-####. walls ok for cover 5/12/2003 9:57:19 AM
|