Final | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 9:00:22 AM. Contact: ###-####.
|
Electrical Rough-In | 5/8/2003 | 5/9/2003 | 5/9/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 11:38:27 PM. Contact: ###-####. r/i ok 5/9/2003 1:17:02 PM
|
Electrical Rough-In | 5/6/2003 | 5/7/2003 | 5/7/2003 | P | PASS |
Jack Frank
|
|
|
shane ###-####; Phone #: ###-#### Internet Inspection Request from: Annette Moore r/i ok needs 15 amp circuit to hydro tub owner will call for r/i when ready 5/7/2003 3:30:15 PM
|