Final | 12/15/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/15/2003 at 10:15:55 AM. Contact: ###-####. ok final note room full furniture unable to check all openings 12/18/2003 8:42:05 AM
|
Electrical Rough-In | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 7:51:20 AM. Contact: ###-####. r/i ok back of garage made into family rm 5/16/2003 3:03:12 PM
|