Final | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 1:48:25 PM. Contact: ###-####.
|
Electrical Rough-In | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | PASS |
Joe Ray
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Annette Moore concrete encased electrode ok /meter set by I.P. without inspection 9/22/2003 2:15:36 PM
|
Final | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 7:24:11 AM. Contact: ###-####. no record of concrete encasement insp for ufer, upstairs closet not finished per 432 9/19/2003 4:29:01 PM
|
Final | 7/14/2003 | 7/15/2003 | 7/15/2003 | A | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 1:32:53 PM. Contact: ###-####.
|
Rough-In Permanent Service | 7/2/2003 | 7/3/2003 | 7/3/2003 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/2/2003 at 11:45:21 AM. Contact: ###-####. r/i ok p/s ready for cover of electrode recall when covered 7/3/2003 8:40:31 AM
|
Electrical Rough-In | 7/1/2003 | 7/2/2003 | 7/2/2003 | A | NR |
Pat Lass
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Not ready 7/2/2003 8:53:52 AM
|
Electrical Rough-In | 5/21/2003 | 5/21/2003 | 5/21/2003 | P | NR |
Tim McCullough
|
|
|
UFFER ONLY- JIM ###-####
not ready CALLED CNT. L.M. 5/21/2003 6:09:31 PM
|