Final | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PASS |
Pat Lass
|
|
|
###-#### Barbara -- please call first for access.
|
Final | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | FAIL |
Pat Lass
|
|
|
barbara-- cell- ###-####- call 1st before insp
lockout for heater 1/14/2004 2:07:58 PM
|
Electrical Rough-In | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 2:20:42 PM. Contact: ###-####.
|
Electrical Rough-In | 6/3/2003 | 6/4/2003 | 6/4/2003 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/3/2003 at 1:07:20 PM. Contact: ###-####.
had conf
grounding not ready and protection
210.52 6/4/2003 11:09:12 AM
|