Final | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 3:38:13 PM. Contact: ###-####.
|
Permanent Service | 6/11/2003 | 6/11/2003 | 6/11/2003 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Rough-In Permanent Service | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 10:08:35 AM. Contact: ###-####. r/i ok corrections made 6/11/2003 2:38:15 PM
|
Rough-In Permanent Service | 6/5/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Jack Frank
|
|
|
STEVE- ###-#### cor. posted called left message see added p/s 6/11/2003 8:48:56 AM
|