Final | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Jim Schmer
|
|
|
BRAD; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
Permanent Service | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Pat Lass
|
|
|
conf 8/13/2003 4:42:51 PM
|
Permanent Service | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 7/24/2003 at 10:38:46 AM. Contact: ###-####. 7/24/2003 11:52:49 AM
P/S O/H R Ok meter only 7/24/2003 1:14:19 PM
|
Permanent Service | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | NR |
Pat Lass
|
|
|
###-####
|
Permanent Service | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | FAIL |
Pat Lass
|
|
|
space 102
110.26 7/22/2003 2:36:33 PM
|
Rough-In Permanent Service | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | NH |
Jim Schmer
|
|
|
BRAD BASEMENT SECTION ; Phone #: ###-#### Internet Inspection Request from: Darla Downs no access left card 6/13/2003 8:33:18 AM
|
Rough-In Permanent Service | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PART |
Jim Schmer
|
|
|
###-#### r/i - ok , need blanks for braker compartment on service. 6/13/2003 11:11:19 AM
|
Rough-In Permanent Service | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 5:56:23 PM. Contact: ###-####. could not find, called contractor left message 6/12/2003 8:26:05 AM
|