Final | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 8:20:35 AM. Contact: ###-####. ok card signed 8/4/2003 1:36:59 PM
|
Rough-In Permanent Service | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 3:46:07 PM. Contact: ###-####. p/s ug n ok 6/12/2003 11:04:47 AM
|
Rough-In Permanent Service | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | FAIL |
Jack Frank
|
|
|
###-#### zane cor. posted called left message 210.52(A) needs recepts bo pocket doors, 250.148 grd all metal boxes, 334.30 shall not staple flat cables on edge, 250.24 (A) terminate G E C at neutral bus 6/10/2003 3:14:29 PM
|