Final | 3/9/2004 | 3/10/2004 | 3/10/2004 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/9/2004 at 11:31:53 AM. Contact: ###-####. ok card signed 3/10/2004 3:55:17 PM
|
Final | 3/3/2004 | 3/4/2004 | 3/4/2004 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 3/3/2004 at 1:41:24 PM. Contact: ###-####. temp occup 3/4/2004 2:59:19 PM
|
Electrical Rough-In | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 2:25:21 PM. Contact: ###-####. ok cover ceiling areas marked on print 1/27/2004 1:41:07 PM
|
Electrical Rough-In | 1/12/2004 | 1/12/2004 | 1/12/2004 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 8:06:37 AM. Contact: ###-####. ceilings see print 1/12/2004 2:17:57 PM
|
Electrical Rough-In | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 2:19:26 PM. Contact: ###-####. ceilings ok 12/23/2003 10:16:54 AM
|
Electrical Rough-In | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 8:58:07 AM. Contact: ###-####. ceiling - ok 12/18/2003 10:59:10 AM
|
Electrical Rough-In | 11/17/2003 | 11/18/2003 | 11/18/2003 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 2:22:27 PM. Contact: ###-####. ok cover walls ri shown on print 11/18/2003 2:32:49 PM
|
ELE-Aging Inspection | 10/28/2003 | 10/28/2003 | 10/28/2003 | | PART |
Jack Frank
|
|
|
WSUC 10/28/2003 4:05:12 PM
|
Electrical Rough-In | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 8:53:54 AM. Contact: ###-####. conference and looked at conduit in block 7/18/2003 10:49:48 AM
|
Electrical Rough-In | 6/30/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 12:37:18 PM. Contact: ###-####. U/G 7/1/2003 12:16:33 PM
|
Electrical Rough-In | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 1:41:25 PM. Contact: ###-####. u/g r/i ok 6/27/2003 4:30:55 PM
|
Electrical Rough-In | 6/27/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Jack Frank
|
|
|
r/i for pre cast walls and ceilings located at state at and highway 55 monroc
|
Electrical Rough-In | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/23/2003 at 11:33:45 AM. Contact: ###-####. u/g ok print high lighted for area inspected 6/24/2003 10:23:52 AM
|
Electrical Rough-In | 6/13/2003 | 6/16/2003 | 6/16/2003 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 9:47:18 AM. Contact: ###-####. ok cover part of west side in the slab conduit 6/16/2003 1:51:35 PM
|