Final | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 7:32:08 AM. Contact: ###-####. ok 7/30/2003 1:25:09 PM
|
Electrical Rough-In | 6/21/2003 | 6/23/2003 | 6/23/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/21/2003 at 9:27:22 PM. Contact: ###-####. ok 6/23/2003 10:50:48 AM
|