Final | 2/24/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/24/2006 at 7:29:37 AM. Contact: ###-####.
|
ELE-Request for Extension | 10/14/2005 | 10/14/2005 | 10/14/2005 | | PASS |
Jim Schmer
|
|
|
###-#### russ extend this time only - jms
|
ELE-Request for Extension | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | NR |
Pat Lass
|
|
|
still working on this remodel.....###-#### russell
|
Rough-In Permanent Service | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 9:24:36 PM. Contact: ###-####. p/s o/h rec - ok 7/8/2003 10:10:04 AM
|
Rough-In Permanent Service | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PART |
Pat Lass
|
|
|
###-#### JOHN
300.4 north basement wall and connect both water pipes as electrodes 6/24/2003 9:29:19 AM
|