Final | 8/5/2003 | 8/5/2003 | 8/5/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 11:28:08 AM. Contact: ###-####.
|
Electrical Rough-In | 7/9/2003 | 7/9/2003 | 7/9/2003 | A | PASS |
Joe Ray
|
|
|
r/i ok 7/9/2003 10:23:42 AM
|
Final | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | CANC |
Joe Ray
|
|
|
please call first ###-#### jack not a final 7/9/2003 10:22:54 AM
|