Final | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 3/1/2004 at 9:36:29 PM. Contact: ###-####.
|
Electrical Rough-In | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 10:05:18 AM. Contact: ###-####. potting for lights ok 7/16/2003 1:56:08 PM
|
Electrical Rough-In | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 9:55:00 PM. Contact: ###-####. trench ok for cover 7/11/2003 9:07:04 AM
|
Electrical Rough-In | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | PASS |
Joe Ray
|
|
|
###-#### john bonding inspection please bond ok
7/10/2003 9:39:38 AM
|