Final | 8/1/2003 | 8/4/2003 | 8/4/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/1/2003 at 4:23:14 PM. Contact: ###-####. ok 8/4/2003 8:57:26 AM
|
Final | 8/1/2003 | 8/1/2003 | 8/1/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/1/2003 at 11:11:28 AM. Contact: ###-####. called needs gfci for 12o volt recepts 210.8 8/1/2003 1:11:16 PM
|
Rough-In Permanent Service | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 9:53:27 AM. Contact: ###-####. r/i ok
p/s o/h new ok 7/23/2003 4:42:51 PM
|
Rough-In Permanent Service | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | NR |
Mike Kinnear
|
|
|
###-#### dave eupher inspection also no ufer ground need -- slab pole const. need two ground rods called contractor 7/10/2003 1:46:12 PM
|