Final | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 8:36:55 AM. Contact: ###-####. ok 9/23/2003 3:55:47 PM
|
Rough-In Permanent Service | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 7:42:55 AM. Contact: ###-####. r/i ok
p/s u/g new ok 7/17/2003 10:53:27 AM
|
Electrical Rough-In | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | NR |
Jack Frank
|
|
|
zane ###-#### contractor called he will reschedule when ready 7/16/2003 3:37:23 PM
|
Rough-In Permanent Service | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | NR |
Jack Frank
|
|
|
###-#### zane met with contractor 7/15/2003 3:44:32 PM
|