Final | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/12/2003 at 9:02:38 AM. Contact: ###-####.
|
Electrical Rough-In | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 9:46:23 AM. Contact: ###-####.
|
Permanent Service | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 2:43:34 PM. Contact: ###-####.
P/S O/H N Ok 9/5/2003 1:02:59 PM
|
Electrical Rough-In | 7/17/2003 | 7/18/2003 | 7/18/2003 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 3:42:24 PM. Contact: ###-####.
|