Final | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 3:39:52 PM. Contact: ###-####.
|
Electrical Rough-In | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 1:28:41 PM. Contact: ###-####. ceiling ok 7/31/2003 2:46:58 PM
|
Electrical Rough-In | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 7/21/2003 at 1:22:42 PM. Contact: ###-####. r/i walls ok 7/22/2003 11:07:39 AM
|