Final | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 9:46:09 AM. Contact: ###-####.
|
Final | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 12:16:48 PM. Contact: ###-####.
Clearances, grounding and unused opening 8/13/2003 9:12:30 AM
|
Electrical Rough-In | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PASS |
Joe Ray
|
|
|
after 2:00 \\###-####
|
Permanent Service | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PASS |
Joe Ray
|
|
|
after 2:00 conduit trench ok for cover 7/28/2003 2:46:03 PM
|