Final | 10/2/2003 | 10/2/2003 | 10/2/2003 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 5:47:21 AM. Contact: ###-####. ok final 10/2/2003 3:56:05 PM
|
Electrical Rough-In | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 6:51:24 PM. Contact: ###-####.
|
Permanent Service | 7/31/2003 | 7/31/2003 | 7/31/2003 | A | PASS |
Pat Lass
|
|
|
P/S U/G N Ok
|
Electrical Rough-In | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 2:40:40 PM. Contact: ###-####. cor,and fee due posted called 300.14, 210.52 (C) outlet spacing right and left of kit sink, 314.43 no screws in non metallic boxes and replace plastic boxes with unused KOs 7/30/2003 9:41:53 AM
|
Electrical Rough-In | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 4:04:42 PM. Contact: ###-####.210.52, 300.4 , GEC to Neutral, 6 In. free conductor 7/29/2003 11:10:38 AM
|