Final | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 9:26:32 AM. Contact: ###-####. ok 3/3/2004 8:43:51 AM
|
Electrical Rough-In | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 8:35:29 AM. Contact: ###-####. ok 7/30/2003 3:03:39 PM
|
Electrical Rough-In | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 10:16:27 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 29 2003 10:47AM.
|