Final | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | NR |
Mike Kinnear
|
|
|
Butch; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes t/w contractor they to get power door problem solved & call back in 12/10/2003 8:32:35 AM
|
Final | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Mike Kinnear
|
|
|
butch; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final 12/10/2003 3:36:39 PM
|
Final | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | FAIL |
Jack Frank
|
|
|
Butch ###-#### cor. posted called 362.12(10) remove or protect ENT front desk, provide bushings where cables pass through alum in power doors, 300.3(C) high and low voltage wiring mixed together in doors, 110.2,110.3 doors shall be listed and approved 12/8/2003 1:56:33 PM
|
Electrical Rough-In | 10/15/2003 | 10/15/2003 | 10/15/2003 | P | PASS |
Mike Kinnear
|
|
|
ceiling on the 2nd floor inspection please//butch ###-#### ok cover 2nd floor ceiling only 10/15/2003 4:30:09 PM
|
Electrical Rough-In | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PART |
Mike Kinnear
|
|
|
butch ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok cover underground conduit part site lighting n.e. side of office part under ground conduit n.w. side warehouse 9/29/2003 1:35:30 PM
|
Electrical Rough-In | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PASS |
Mike Kinnear
|
|
|
butch-- ###-#### ok cover walls & hard lid ceilings in office area 8/20/2003 10:23:43 AM
|
Electrical Rough-In | 8/18/2003 | 8/19/2003 | 8/19/2003 | P | NR |
Mike Kinnear
|
|
|
###-#### butch not ready 8/19/2003 4:06:41 PM
|
Temporary Service | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | NR |
Mike Kinnear
|
|
|
###-#### dan not ready called contractor 7/30/2003 9:57:58 AM
|