Final | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PASS |
Jack Frank
|
|
|
1)We upgraded the service to 200amps. 2)We replaced the subpanel(fusebox) in the basement with a 100amp breaker panel.
3)We fed the dryer ckt. and the oven/cooktop ckt. from the new outdoor all-in-one panel. 4)We ran a 20amp 220volt ckt. in IMC out to a sprinkler pump receptacle which is controlled by a float switch and a pump start relay.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|