Final | 11/13/2003 | 11/14/2003 | 11/14/2003 | A | PASS |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: Joe Thomas ok final 11/14/2003 10:27:44 AM
|
Permanent Service | 10/20/2003 | 10/20/2003 | 10/20/2003 | P | PASS |
Pat Lass
|
|
|
The contractor has installed a platform at the main service disconnect located on the Southeast corner of the building. This is the only thing we need inspected at this point to allow us to swing the power to the building. Thanks, Heath; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
P/S U/G N Ok 10/20/2003 1:54:23 PM
|
Electrical Rough-In | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | PASS |
Pat Lass
|
|
|
Insulation is down for wall inspection.Thanks, Heath; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|
Rough-In Permanent Service | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | FAIL |
Pat Lass
|
|
|
Please call Heath @###-#### when you are in route to this job. Thanks; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
clearance in front opf main
remove insulataion 9/10/2003 11:20:53 AM
|
Rough-In Permanent Service | 8/13/2003 | 8/14/2003 | 8/14/2003 | A | PART |
Pat Lass
|
|
|
Please call heath @###-####. Project not complete but we need a partial; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
back pattio ceilings ok
Not enough info to determine service configuration 8/14/2003 9:08:59 AM
|