Final | 8/21/2003 | 8/25/2003 | 8/25/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 3:40:47 PM. Contact: ###-####.
|
Electrical Rough-In | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 2:57:55 PM. Contact: ###-####. 210-63 shall have recpt with-in 25 feet of units on rooftop 8/12/2003 10:14:49 AM
|