Final | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 2:23:32 PM. Contact: ###-####.
|
Electrical Rough-In | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 10:13:34 AM. Contact: ###-####. ok 8/14/2003 2:21:54 PM
|