Final | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 3:00:51 PM. Contact: ###-####. ok 9/30/2003 7:36:08 AM
|
Final | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 3:34:10 PM. Contact: ###-####. conference ok 9/5/2003 10:36:27 AM
|
Electrical Rough-In | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | FAIL |
Jack Frank
|
|
|
called covered be inspection, 300.5 u/g not deep enough, needs approved jbox called
|