Final | 9/9/2003 | 9/9/2003 | 9/9/2003 | A | PASS |
Mike Kinnear
|
|
|
ok final
|
Rough-In Permanent Service | 9/5/2003 | 9/9/2003 | 9/9/2003 | A | CANC |
Mike Kinnear
|
|
|
We replaced a single-pole switch with a stacked single-pole-by-single-pole switch and replaced the #14-2 switch-leg with a #14-3 switch-leg to allow seperate switching of the paddle fan and the light kit.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell wrong inspection 9/9/2003 11:08:32 AM
|