Final | 11/7/2003 | 11/7/2003 | 11/7/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 8:01:16 AM. Contact: ###-####.
|
Electrical Rough-In | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 3:08:18 PM. Contact: ###-####. support conduit 9/9/2003 9:16:15 AM
|
Electrical Rough-In | 9/9/2003 | 9/9/2003 | 9/9/2003 | P | PASS |
Joe Ray
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs walls only ok for cover 9/9/2003 1:40:03 PM
|