Final | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/31/2003 at 10:17:49 AM. Contact: ###-####. ok 12/31/2003 1:29:39 PM
|
Final | 12/29/2003 | 12/30/2003 | 12/30/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/29/2003 at 2:42:41 PM. Contact: ###-####. cor. posted called 314.17(A) needs connector for grd wire in relay jbox by panels, 410.14 shall provide access to boxes fixture mounted over boxes 12/30/2003 3:19:55 PM
|
Permanent Service | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 9:03:59 AM. Contact: ###-####.
p/s u/g new ok 10/6/2003 12:29:17 PM
|
Permanent Service | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 9:42:57 AM. Contact: ###-####. corrections not made called 9/22/2003 12:11:51 PM
|
Permanent Service | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 9:40:49 AM. Contact: ###-####. cor. posted called 250.64(C) shall not splice GEC, can use GEC tap rule 9/19/2003 3:28:21 PM
|
Rough-In Permanent Service | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PART |
Pat Lass
|
|
|
###-####
R/I Only 9/18/2003 11:14:59 AM
|
Rough-In Permanent Service | 9/16/2003 | 9/17/2003 | 9/17/2003 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 1:10:53 PM. Contact: ###-####. see added inspection, no access driveways under construction will do 09-18-03 am called 9/17/2003 3:53:45 PM
|
Conference | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 8:12:06 AM. Contact: ###-####.
|
Electrical Rough-In | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | PART |
Jack Frank
|
|
|
outside soffits ok
|