Final | 6/19/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 6/19/2004 at 9:57:50 AM. Contact: ###-####.
|
Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Joe Ray
|
|
|
|
Electrical Rough-In | 11/11/2003 | 11/12/2003 | 11/12/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/11/2003 at 7:44:34 AM. Contact: ###-####. p/s ug n ok 11/12/2003 9:11:46 AM
|