Final | 3/31/2004 | 3/31/2004 | 3/31/2004 | P | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 3/31/2004 at 8:34:26 AM. Contact: ###-####. 3/31/2004 1:03:09 PM
|
Final | 3/29/2004 | 3/30/2004 | 3/30/2004 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/29/2004 at 1:49:28 PM. Contact: ###-####.
207-108 & 111 not ready
8 units floor boxes on 2nd floor still loose
110 hood missing
101 add receps above counter on island and remove close bar from utility room 3/30/2004 4:45:30 PM
|
Final | 3/28/2004 | 3/29/2004 | 3/29/2004 | A | CANC |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 3/28/2004 at 6:53:45 PM. Contact: ###-####. 3/29/2004 7:38:55 AM
|
Final | 3/29/2004 | 3/29/2004 | 3/29/2004 | P | CANC |
Pat Lass
|
|
|
|
Final | 3/29/2004 | 3/29/2004 | 3/29/2004 | P | PART |
Pat Lass
|
|
|
212-213-214-&215 floor box loose.
210 loose recep right of stove.
212 entry lite not working.
214 loose recep to left of back door.
205 &214 recep under 6in + overhang
207 not ready 3/29/2004 4:39:29 PM
|
Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | A | PART |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 3/25/2004 at 1:50:24 PM. Contact: ###-####. 3/26/2004 7:38:23 AM
201-202-203-205-216-219-220-221&222 are ok
204 requires a counter recep on island
218&219 require floor boxes. 3/26/2004 10:25:12 AM
|
Final | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | PART |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 3/25/2004 at 8:21:33 AM. Contact: ###-####. 3/25/2004 11:51:27 AM
I am doing some each day until they are all done.
today I did 220-202 models that require furniture to be moved. please call ahead so they can have them ready for us.
I did 201-219-221-222
221 had missing fixture in bathroom and all require metal plates for floor outlets
3/25/2004 4:30:08 PM
|
ELE-Aging Inspection | 2/20/2004 | 2/20/2004 | 2/20/2004 | | NR |
Pat Lass
|
|
|
suc 2/20/2004 9:42:39 AM
|
Electrical Rough-In | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | CANC |
Pat Lass
|
|
|
|
Electrical Rough-In | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Pat Lass
|
|
|
|
Permanent Service | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 4:55:15 PM. Contact: ###-####.
|
Electrical Rough-In | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | PASS |
Pat Lass
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Electrical Rough-In | 11/19/2003 | 11/19/2003 | 11/19/2003 | P | PART |
Pat Lass
|
|
|
jim 859-975 first floor and hakf of 2nd floor 11/19/2003 4:18:59 PM
|
Electrical Rough-In | 11/13/2003 | 11/14/2003 | 11/14/2003 | A | PART |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 11/13/2003 at 3:15:16 PM. Contact: ###-####. 11/14/2003 7:36:19 AM
south side of 1st floor ANOP 11/14/2003 12:52:57 PM
|
Electrical Rough-In | 11/12/2003 | 11/13/2003 | 11/13/2003 | P | NR |
Pat Lass
|
|
|
###-####- jim
had conf 11/13/2003 2:38:48 PM
|