Final | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 12/10/2003 at 3:27:22 PM. Contact: ###-####. 12/11/2003 7:37:41 AM
|
Electrical Rough-In | 11/14/2003 | 11/14/2003 | 11/14/2003 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 11/14/2003 at 7:24:44 AM. Contact: ###-####. 11/14/2003 7:37:06 AM
kitchen ok 11/14/2003 10:33:44 AM
|