Final | 4/12/2004 | 4/13/2004 | 4/13/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/12/2004 at 3:23:00 PM. Contact: ###-####.
|
Conference | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | PART |
Pat Lass
|
|
|
1:15 pm ###-#### hopkins 4/12/2004 9:56:42 AM
|
Rough-In Permanent Service | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PASS |
Jim Schmer
|
|
|
Alan ###-#### p/s u/g new - ok 12/19/2003 1:03:08 PM
|
Electrical Rough-In | 12/11/2003 | 12/12/2003 | 12/12/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 10:07:17 PM. Contact: ###-####. cor. posted called 300.4 11/4" 12/12/2003 10:22:51 AM
|