Final | 2/6/2004 | 2/9/2004 | 2/9/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/6/2004 at 3:19:06 PM. Contact: ###-####. ok 2/9/2004 9:46:07 AM
|
Electrical Rough-In | 12/18/2003 | 12/23/2003 | 12/23/2003 | A | PASS |
Joe Ray
|
|
|
Steve ###-#### p/s ug n ok 12/23/2003 10:17:12 AM
|