Final | 4/26/2004 | 4/26/2004 | 4/26/2004 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 7:59:56 AM. Contact: ###-####.
|
Electrical Rough-In | 1/2/2004 | 1/5/2004 | 1/5/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 1/2/2004 at 5:35:03 PM. Contact: ###-####.
|
Electrical Rough-In | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | NH |
Joe Ray
|
|
|
###-#### John called contr 12/22/2003 2:34:48 PM
|