Final | 5/12/2006 | 5/15/2006 | 5/15/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/12/2006 at 2:25:28 PM. Contact: ###-####. corr made, ok to final
|
Final | 5/10/2006 | 5/12/2006 | 5/12/2006 | P | FAIL |
Bob Reichert
|
|
|
morgan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met owner, left list to tighten boxes and recpts,rev polarity at water softener, flush out recpts, cover for furnace sw, said to fix and recall in for final
|
Electrical Rough-In | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/24/2006 at 2:55:56 PM. Contact: ###-####. talked to owner, said to use green ground screw, replace 2 boxes, switch hot not neutral. ric ok
|
Electrical Rough-In | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | FAIL |
Bob Reichert
|
|
|
Jeff -- for cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong met owner, left correction notice, 210.52 recpt shall be within 6' of door, 334.80 nm cable shall be secured within 12" of boxes, 250.80 metal enclosures shall be grounded,BCC all make-up shall be done
|