Final | 2/13/2004 | 2/17/2004 | 2/17/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/13/2004 at 2:00:34 PM. Contact: ###-####.
|
Rough-In Permanent Service | 1/15/2004 | 1/16/2004 | 1/16/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 1/15/2004 at 1:21:34 PM. Contact: ###-####. p/s ug n ok 1/16/2004 3:34:31 PM
|
Rough-In Permanent Service | 1/7/2004 | 1/13/2004 | 1/12/2004 | A | CANC |
Joe Ray
|
|
|
###-#### steve--cancel per steve will re-schedule
|