Final | 9/8/2004 | 9/9/2004 | 9/9/2004 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/8/2004 at 8:51:01 PM. Contact: ###-####.
|
Final | 9/7/2004 | 9/7/2004 | 9/7/2004 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 9:11:31 AM. Contact: ###-####.
Reversed polarity in basement.
Master closet fixture not inclosed.
recep to serve pininsula counter.
washer recep wrong type.
clean up bath and kitchen circuits.
Lock out for dishwasher
9/7/2004 2:10:48 PM
|
Electrical Rough-In | 5/20/2004 | 5/21/2004 | 5/21/2004 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 4:32:04 PM.
R/I Ok
P/S U/G N OK 5/21/2004 10:47:12 AM
|
Electrical Rough-In | 2/9/2004 | 2/10/2004 | 2/10/2004 | A | PART |
Pat Lass
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Annette Moore
electrode ok 2/10/2004 10:08:56 AM
|
Conference | 2/6/2004 | 2/9/2004 | 2/9/2004 | A | DONE |
Pat Lass
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|