Rough-In Permanent Service | 1/9/2004 | 1/12/2004 | 1/12/2004 | A | PASS |
Mike Kinnear
|
|
|
We replaced 2 RV panels at Space #6/7 and replaced 2 RV panels at Space #8/9. We replaced the direct burial wire with PVC and THHN wire between these two Spaces.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok final 1/12/2004 9:03:08 AM
|