Final | 4/15/2004 | 4/19/2004 | 4/19/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 1:30:02 PM. Contact: ###-####.
|
Electrical Rough-In | 4/7/2004 | 4/8/2004 | 4/8/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/7/2004 at 11:07:29 AM. Contact: ###-####. ceiling ok for cover 4/8/2004 9:55:58 AM
|
Electrical Rough-In | 2/10/2004 | 2/11/2004 | 2/11/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/10/2004 at 3:23:02 PM. Contact: ###-####. walls and hard lid ok 2/11/2004 4:06:46 PM
|
Electrical Rough-In | 1/9/2004 | 1/12/2004 | 1/12/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 1/9/2004 at 11:43:06 AM. Contact: ###-####. r/i under slab 1/12/2004 1:51:27 PM
|