Final | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/24/2004 at 2:37:20 PM. Contact: ###-####.
|
Final | 2/23/2004 | 2/24/2004 | 2/24/2004 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/23/2004 at 8:38:31 AM. Contact: ###-####. grd conductor shall land on neutral bus/bond water at nearest point from transformer 2/24/2004 2:24:02 PM
|
Final | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/23/2004 at 8:38:31 AM. Contact: ###-####. contractor called and canceled 2/23/2004 12:29:09 PM
|
Electrical Rough-In | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/20/2004 at 3:01:05 PM. Contact: ###-####. walls ok 1/21/2004 9:38:42 AM
|
Electrical Rough-In | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | NR |
Mike Kinnear
|
|
|
###-#### Sean. all the boxes not installed, & need straping on conduit in walls. 1/20/2004 4:35:46 PM
|