Final | 7/13/2004 | 7/14/2004 | 7/14/2004 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 7/13/2004 at 4:27:28 PM. Contact: ###-####. ok final 7/14/2004 8:49:25 AM
|
Electrical Rough-In | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | PASS |
Jack Frank
|
|
|
LOWELL; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok 3/9/2004 8:28:17 AM
|
Electrical Rough-In | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | PART |
Jack Frank
|
|
|
lowell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore conference only ok no r/i box fill, replace 2 gang box with broken clamps, family rm on kit. circuit, 6" free conductor, seal KOs in sub panel met contractor 3/5/2004 1:35:24 PM
|
Electrical Rough-In | 3/4/2004 | 3/4/2004 | 3/4/2004 | P | FAIL |
Jack Frank
|
|
|
Loal; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes called need to meet contractor box fill 300.4 210.52(ABC) 3/4/2004 2:20:37 PM
|
Permanent Service | 2/6/2004 | 2/9/2004 | 2/9/2004 | A | PASS |
Jack Frank
|
|
|
lowell; Phone #: ###-#### Internet Inspection Request from: Annette Moore
p/s o/h rec. ok 2/9/2004 8:34:40 AM
|
Conference | 1/29/2004 | 1/29/2004 | 1/29/2004 | P | PART |
Jack Frank
|
|
|
###-#### lowell 01 ok 1/29/2004 3:37:02 PM
|