Rough-In Permanent Service | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | PASS |
Jack Frank
|
|
|
We:1)ran two PVC conduits(with 1 circuit in each)in customer's trench(24" deep)from a new j-box on the trailer: 1 pvc to the existing well-head to by-pass the existing faulted circuit, and 1 pvc to the light pole near the gate for the new pole light.
3)ran EMT and IMC from the trailer to the panel inside the building for power.
Customer has back-filled the trench so they could drive across it.
Thanks !!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok 2/9/2004 12:26:41 PM
|