Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 10:25:40 PM. Contact: ###-####. called 3/3/2005 8:10:57 AM
|
Final | 3/3/2005 | 3/3/2005 | 3/3/2005 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/3/2005 at 8:07:34 AM. Contact: ###-####. ok 3/3/2005 10:02:17 AM
|
ELE-Aging Inspection | 11/2/2004 | 11/2/2004 | 11/2/2004 | | PART |
Jack Frank
|
|
|
called contractor WSUC 11/2/2004 3:56:04 PM
|
Electrical Rough-In | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | PASS |
Jack Frank
|
|
|
u/g ok contractor will encase uf and pvc in concrete for cover requirements
|
Final | 8/5/2004 | 8/5/2004 | 8/5/2004 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 7:12:09 AM. Contact: ###-####. see added u/g r/i 8/5/2004 1:19:40 PM
|
Final | 7/20/2004 | 7/20/2004 | 7/20/2004 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/20/2004 at 8:06:00 AM. Contact: ###-####. cor. posted called see PM# ele03-02865 for info
7/20/2004 2:15:08 PM \ 7/20/2004 2:15:08 PM
|
ELE-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 | | PART |
Jack Frank
|
|
|
wsuc stopped at job site 6/8/2004 8:17:34 AM
|
Electrical Rough-In | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 10:18:04 PM. Contact: ###-####. see added p/s 4/7/2004 10:06:13 AM
|
Permanent Service | 4/7/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Electrical Rough-In | 3/12/2004 | 3/15/2004 | 3/15/2004 | P | PASS |
Jack Frank
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore all 3 units ok 3/15/2004 12:56:52 PM
|