Final | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 7:57:12 AM. Contact: ###-####. ok 10/11/2004 10:17:03 AM
|
Electrical Rough-In | 3/22/2004 | 3/22/2004 | 3/22/2004 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/22/2004 at 7:52:54 AM. Contact: ###-####. ok 3/22/2004 9:45:57 AM
|
Permanent Service | 3/22/2004 | 3/22/2004 | 3/22/2004 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Electrical Rough-In | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 1:09:04 PM. Contact: ###-####. cor. posted called outlet spacing all locations walls, and countertops, box fill nail plates and 11/4" all make shall be complete COW 3/19/2004 10:24:17 AM
|
Electrical Rough-In | 3/19/2004 | 3/19/2004 | 3/19/2004 | A | FAIL |
Jack Frank
|
|
|
plans at site do not match the job
|