Final | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 10:40:37 AM. Contact: ###-####.
|
Electrical Rough-In | 6/1/2004 | 6/1/2004 | 6/1/2004 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 6:51:51 AM. Contact: ###-####. p/s ug n ok 6/1/2004 4:09:03 PM
|
Electrical Rough-In | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/27/2004 at 6:56:35 AM. Contact: ###-####.
all violations remain also found boxes overfilled in hall downstairs 5/27/2004 1:27:46 PM
|
Electrical Rough-In | 5/25/2004 | 5/25/2004 | 5/25/2004 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/25/2004 at 8:07:38 AM. Contact: ###-####. cor. posted called 300.4,1 1/4", 314.43 no screws in plastic boxes, 300.14 short grds and splice shall be at 6", clearence for closet fixtures? 5/25/2004 2:22:54 PM
|