Permanent Service | 4/8/2004 | 4/8/2004 | 4/8/2004 | A | DONE |
Pat Lass
|
|
|
had conf with Patty from Id. Power and Jack 4/8/2004 8:09:52 AM 4/8/2004 8:10:24 AM
|
Permanent Service | 4/8/2004 | 4/8/2004 | 4/8/2004 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Final | 3/23/2004 | 3/23/2004 | 3/23/2004 | P | PASS |
Jack Frank
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called needs bond bushing, or use non metallic sealtight from p/s to plastic sprinkler time clock 314.3 3/23/2004 11:57:00 AM
|
Permanent Service | 3/23/2004 | 3/23/2004 | 3/23/2004 | A | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Final | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | FAIL |
Pat Lass
|
|
|
###-####
250.24 Grounding Service-Supplied Alternating-Current Systems.
(A) System Grounding Connections.
(1) General. The connection shall be made at any accessible point from the load end of the service drop or service lateral to and including the terminal or bus to which the grounded service conductor is connected at the service disconnecting means.
3/22/2004 4:34:42 PM
|