Conference | 3/31/2005 | 3/31/2005 | 3/31/2005 | P | PASS |
Jim Schmer
|
|
|
1 pm with general JMS
|
Final | 3/30/2005 | 3/31/2005 | 3/31/2005 | P | NR |
Pat Lass
|
|
|
1:00 pm appointment
had conf 3/31/2005 1:51:10 PM
|
Final | 3/30/2005 | 3/30/2005 | 3/30/2005 | A | CANC |
Pat Lass
|
|
|
|
Final | 3/30/2005 | 3/30/2005 | 3/30/2005 | A | NR |
Pat Lass
|
|
|
phone conf only 3/30/2005 10:04:07 AM
|
Final | 3/28/2005 | 3/29/2005 | 3/29/2005 | A | NR |
Pat Lass
|
|
|
Pat, this is the permit we talked about from Power Plus. Please let me know if you were able to final this one out. Thanks, Cathy
more electrical work has been done without a permit.
posted stop work
gave 24 hrs to get permit. 3/29/2005 10:03:53 AM
|
Permanent Service | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | PASS |
Pat Lass
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
P/S O/H N Ok 3/25/2004 3:25:52 PM
|
Rough-In Permanent Service | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | FAIL |
Pat Lass
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
bond nipple between meter and panel.
concrete electrode required.
secure raceways at service within 3 ft.
arrange flex to recep under panel to drain.
bond water piping system. 3/24/2004 3:24:11 PM
|